Question #1 - Topic 1

Which of the following types of layouts is most efficient in a lean production environment?

A. Islands

B. Connected islands

C. Functional layout

D. Cells

Question #2 - Topic 1

Which plant type describes a product at one stage that can be transformed into several
distinct products at the next stage (divergent points)?

A. A-Plant

B. I-Plant

C. T-Plant

D. V-Plant

Question #3 - Topic 1

Which of the following production environment strategies requires unique design or
significant customization?

A. Make-to-order

B. Assemble-to-order

C. Make-to-stock

D. Engineer-to-order

Question #4 - Topic 1

Manufacturing overhead includes which of the following types of costs?

A. Interest expense

B. Supervision

C. Direct labor

D. Direct material

Question #5 - Topic 1

A company's cost of goods sold would be found on which of the following financial
documents?

A. Balance sheet

B. Income statement

C. Cash flow statement

D. Performance statement

Question #6 - Topic 1

Which of the following types of manufacturing processes would tend to have the lowest
work in process (WIP) inventory?

A. Project

B. Intermittent

C. Batch

D. Flow

Question #7 - Topic 1

Which of the following issues would be of greatest concern for a company choosing to
reduce its finished goods inventory?

A. Long production changeover time

B. Customer service expectations

C. Product quality requirements

D. Product shelf life constraints

Question #8 - Topic 1

In an assemble-to-order production environment, the master production schedule contains:

A. standard items.

B. finished items.

C. raw materials.

D. subassemblies.

Question #9 - Topic 1

Having the needed materials within easy reach of a subassembly process eliminates waste
of:

A. motion.

B. transportation.

C. making defects.

D. stocks.

Question #10 - Topic 1

Which of the following tools is considered to be one of the seven quality tools?

A. Gantt chart

B. Input/output chart

C. Control chart

D. Capacity chart

Question #11 - Topic 1

The heijunka philosophy can best be described as:

A. level production.

B. make-to-stock production.

C. a chase production strategy.

D. produce to stock production.

Question #12 - Topic 1

Which of the following manufacturing processes would be characterized by a narrow range
of standard products, low direct labor costs, and a high level of technical support for
manufacturing?

A. Jobbing

B. Intermittent

C. Flow

D. Project

Question #13 - Topic 1

Which of the following concepts could a firm implement to reduce defects?

A. Hansei

B. Jidoka

C. Muri

D. Heijunka

Question #14 - Topic 1

Which of the following factors is included in cost of goods sold?

A. Revenue

B. General and administrative expenses

C. Overhead

D. Standard cost

Question #15 - Topic 1

Reducing set up time will affect item lead time and throughput in which of the following
ways?

A. Lead time will increase, throughput will decrease

B. Lead time will increase, throughput will increase

C. Lead time will decrease, throughput will increase

D. Lead time will decrease, throughput will decrease

You Need Avanset VCE Player in Order to Open VCE Files

Try Our Special 30% Discount Offer for
Premium CPIM-BSP VCE File

  • Verified by experts

CPIM-BSP Premium File

  • Real Questions
  • Last Update: Oct 10, 2019
  • 100% Accurate Answers
  • Fast Exam Update

$14.99

$21.41

AUTUMN SALE: 30% DISCOUNT
This is ONE TIME OFFER

You save
30%

Enter Your Email Address to Receive Your 30% Discount Code

AUTUMN SALE: 30% DISCOUNT

You save
30%

Use Discount Code:

A confirmation link was sent to your e-mail.

Please check your mailbox for a message from support@exam-labs.com and follow the directions.